Power GenerationMalaysiaCase Study

Patau Patau Cooling Upgrade

104 MWgas turbine plant cooling conversion
GT-6BAIR-COOLED RETROFIT
Project Context

The Challenge

Converting the cooling system of three Frame 6B Gas Turbines (104MW plant) from water-cooled to air-cooled to address efficiency issues.

Engineering Delivery

Navsar's Technical Solution

Complete engineering study, design of Air-Cooled Heat Exchanger with PLC automation, fabrication, and remote commissioning supervision.

Verified Outcome

Business Impact

Eliminated water dependency and enhanced cooling reliability for the 104MW plant.

104 MWgas turbine plant cooling conversion

Cross-Disciplinary Interfaces

Need similar technical certainty for your project?

Navsar takes technical control of the interval between mechanical completion and reliable operation, delivering an audit-ready handover.