Navsar delivers end-to-end technical oversight, site management, and specialised electro-mechanical installation across complex industrial assets, renewable energy facilities, and critical utility upgrades. Navsar owns field outcomes and ensures construction activities adhere to engineering design integrity.

Scope & Capabilities

What This Service Covers

Comprehensive site development administration and construction management
Mechanical and electrical installation for heavy power generation blocks
Utility conversions, burner retrofits, and boiler modifications
Renewable energy site construction (utility-scale solar and wind farms)
Marine-spec DC fast-charging systems and offshore topsides integration
Rigorous QA/QC inspection regimes and HSE-certified site operations
Tangible Outputs

Typical Deliverables

Site execution plans, logistics coordination, and HSE protocols

Audit-Ready Artifact

Daily construction milestone tracking and progress logs

Audit-Ready Artifact

Mechanical completion dossiers and pre-commissioning walkdown records

Audit-Ready Artifact

Quality assurance inspection test plans (ITP) and sign-off records

Audit-Ready Artifact

Grid synchronisation readiness dossiers for utility interconnection

Audit-Ready Artifact
Governance & Compliance

Interfaces & Technical Standards

  • International construction safety and engineering standards (OSHA, WSH)
  • IEC / IEEE electrical installation and earthing regulations
  • Civil, structural, mechanical, and electrical subcontractor interfaces
  • OEM installation manuals and warranty-preserving specifications
Industry Application

Related Industry Sectors

Field References

Selected Projects in This Domain

DC FASTCHARGERMARINE BMSCCS2 EXTENDED COMMSSYNC
Marine and Offshore

Marine EV Fast Charger Commissioning — Southeast Asia

Commissioning a marine-spec DC fast charger for an electric harbour craft required overcoming unique signal integrity issues. Standard automotive chargers are designed for short cables, but the extended run from a vessel's CCS2 inlet to its internal Battery Management System (BMS) degraded communication signals, jeopardizing the essential charging handshake.

Read Case Study
APH-1APH-2APH-3APH-420-DAY SHUTDOWN WINDOW
Oil and Gas

APH Turnaround Contract — India

Replacing four Air Pre-Heaters (APHs) across critical Hydrogen and Delayed Coker units within a strict 20-day shutdown. The project required coordinating parallel scopes, a single heavy crane, and a 150-person workforce at a major refinery.

Read Case Study
BOILERNAT GASHFO (RETIRED)BMS
Power Generation

Arab Potash Plant Conversion

Transitioning a major facility in Jordan from Heavy Fuel Oil (HFO) to Natural Gas to improve efficiency and meet sustainability goals.

Read Case Study